Hot Rod Express Home Page Find out About Hot Rod Express Past Projects of Hot Rod Express Current Projects of Hot Rod Express Contact Hot Rod Express
Hot Rod Express Store Paint and Body work by Hot Rod Express See Custom Fabrications done by Hot Rod Express See Interiors done by Hot Rod Express Local Events in the area around Hot Rod Express
See Performance Engines created by Hot Rod Express

'27 T-Bucket

Pages 1 - 2 - 3 - 4 - 5
The '27 T-Bucket before

The '27 T-Bucket before.

Rear end pieces laid out on a table

The Heidts IRS rear end is shipped in pieces and must be assembled.

Axle seals and studs installed

The first step is to install the axle seals and studs to bolt in the stub axles.

Third member and stub axles installed

After that the third member can be installed, and then the stub axles.

Front pinion plate being installed

The front pinion plate is installed onto the pinion assembly using the bolt that holds the pinion assembly to the third member.

Control arms being installed

Next we begin to install the control arms.

Closer view of the control arms being installed

 

Brake rotors and half shafts installed

Here the brake rotors and half shafts have been installed.

 

Outer uprights and bearings for half shaft put on

Next are the outer uprights, and bearings which the half shaft will ride in.

Top crossmember added

The last thing to be installed onto the new rear end is the top crossmember, which will provide a mounting point to the frame.

Pages 1 - 2 - 3 - 4 - 5
Website by MacLoch Designs